Some additional electrical work

06 December 2015

Finally got around to cleaning up the Hurricane II hydronic heater electrical wiring (more about how great Hurricane folks are later).  Now it is time to label and fabricate a protective cover.  Box for the rotary selector switch and dryer breaker fabricated and installed.  Twelve new Trojan t105 batteries were installed in 4 battery boxes in series/parallel 12 volt system.  We have also begun to add structure in the center and  next to the steering room doors on which to mount the hinges which are being fabricated.